Operations in difficult weather conditions can result in loads that exceeds the capacity of the mooring- and structural components in the plant. It can be difficult to know the operational limits and decide whether to terminate the operation due to the weather conditions.
In consultation with our customers, we can do analyses of: o The load effects from the boat to the plant or the feeding barge o Suitable weather windows for the operations
Analysis of well-boat